Back to blog
Practical Guide6 min read

Vietnam to Indonesia: six pre-shipment checks for processed food

Indonesia’s halal timetable changed, but BPOM product approval and per-entry SKI controls did not disappear. Use these six checks before releasing processed food from Vietnam.

Vietnamese food export and Indonesian import teams checking sealed cartons, product documents and a refrigerated container before shipment

Indonesia changed the halal-certification timetable for foreign food and beverages, but that does not remove the import controls administered by the Indonesian Food and Drug Authority, BPOM. For a commercial shipment of processed food from Vietnam, the operational file still needs the right Indonesian product approval, shipment documents and a Surat Keterangan Impor Post Border, or SKI Post Border.

This guide covers ordinary commercial processed food. Fresh food, alcohol, sugar, salt, samples, donations and other specially controlled goods can follow different rules. Confirm the HS classification and product treatment with the Indonesian importer before booking.

Six checks before cargo release

1. Confirm that the product and importer are ready before the booking

BPOM Regulation 27/2022, as amended by Regulation 28/2023, requires food and drugs imported for circulation to have an Izin Edar, or marketing authorization. Importation may be carried out by the authorization holder or its authorized party. The applicant also needs the Indonesian business and system access required for the SKI process.

Ask the importer to confirm the exact approved product, pack size, label version, manufacturer, warehouse and HS code. A purchase order or distributor appointment alone is not a BPOM product approval.

2. Freeze the commercial and regulatory product identity

The invoice, product name, packaging, pack size, lot data, manufacturer, exporter and HS code should match the approved and application data. BPOM requires the approved label and its amendments. If the exporter differs from the producer in the country of origin, the application needs a producer letter. If the food name in the import documents differs from the marketing authorization, a producer letter is also required.

Treat any last-minute label, pack or shipper change as a regulatory change-control event, not only a documentation edit.

3. Build the batch file at the factory

The electronic SKI application requires the marketing authorization, invoice and certificate of analysis, or an SPPT SNI certificate where mandatory SNI treatment applies. The certificate of analysis should be issued by the manufacturer; if it is not, the amended rule allows it for processed food only from an accredited laboratory.

Vietnamese exporters should send the importer a clean batch pack: invoice, packing data, lot numbers, production and expiry dates, certificate of analysis, approved-label reference and any producer letters. Do not wait until arrival to reconcile these fields.

4. Protect the two-thirds shelf-life threshold

At the time of the SKI application, processed food must generally retain at least two-thirds of its total shelf life. The rule has an exception for processed food that legally has no expiry limit.

Calculate the threshold from the actual production and expiry dates, then include document preparation, sailing, port handling and correction time. A product can be commercially saleable yet fail this regulatory threshold if the application is made too late.

5. Plan one SKI Post Border for each entry

For processed food, Regulation 28/2023 assigns SKI Post Border rather than SKI Border. Each SKI applies to one import entry. The importer may apply before it has the import declaration number and date, but must have the SKI Post Border no later than seven calendar days from the release-approval date.

Post-border does not mean “paperwork optional after release.” The applicant may not distribute, transfer or use the goods before the SKI is issued. Put an inventory hold in the warehouse system and release it only against the issued SKI.

6. Keep the halal file separate from the BPOM gate

PP 40/2026 moved the start of mandatory halal certification for foreign food, beverages, slaughter products and slaughter services to 18 October 2028, subject to the stated mutual-recognition consideration. That change does not cancel BPOM marketing authorization, label, shelf-life or SKI requirements.

If a product is marketed as halal, or the buyer requires halal evidence, verify the applicable foreign-certificate, recognition and registration route with BPJPH and the importer. Do not use the 2028 date as a statement that no halal preparation is needed, and do not use a halal certificate as a substitute for an SKI.

What the six-hour service standard does and does not mean

BPOM’s rule provides an evaluation period of up to six working hours after a complete application is received and the non-tax state revenue is paid. The clock stops when corrections or additional data are required. It is therefore not a guaranteed six-hour end-to-end release from the first draft submitted by an exporter.

BPOM Batam’s June 2026 notice reported enforcement attention to processed-food entries without SKI and described the control as post-border supervision. The practical response is to complete the product and batch file before departure, not to build buffer around a hoped-for waiver.

Vietnam freight and trade impact

For Vietnamese suppliers, the most controllable delay risks sit upstream: mismatched product names, changed pack sizes, missing producer letters, late certificates of analysis and insufficient remaining shelf life. These problems can stop the Indonesian importer from completing the SKI file even when the vessel and customs release proceed as planned.

Before cargo handover, obtain written confirmation from the importer that the Izin Edar, approved label, SMKPO certificate, applicant authority and SKI filing plan are current for that exact product and entry. Keep the freight booking conditional until the regulatory identity and batch pack are aligned.

Confidence is high on the cited national rules, their dates and the stated BPOM controls. Confidence is medium on how a specific product will be classified because HS treatment, product composition, special controls and current system practice can differ. This is an operational checklist, not legal advice or a guarantee of release time.

Turn this guidance into a shipment check

Use the relevant commercial route or Vietnam handling service below, then send the real shipment details for a current option. Rates, space and transit plans are checked against the live requirement.

Official and editorial sources

Need an updated freight quote?

Send John your cargo details and preferred route. He will help check the best practical option.

Get a Freight Quote

Related articles