Vietnam–Gulf bookings: check the new PSS
A six-point booking check for Maersk's carrier-specific Peak Season Surcharge on Vietnam-origin containers to five Gulf destinations from 19 November 2026.

A carrier surcharge changed yesterday for selected containers moving from Vietnam to the Gulf. Maersk's official notice sets a Peak Season Surcharge, or PSS, of USD 1,000 per 20-foot container and USD 2,000 per 40- or 45-foot container, effective for Vietnam origin from 19 November 2026 until further notice.
The destination scope in the notice is the United Arab Emirates, Bahrain, Kuwait, Qatar and Dammam in Saudi Arabia. This is a Maersk rate announcement, not a market-wide tariff and not the total cost of a shipment.
What the notice actually says
The PSS is quoted per container. It applies across the equipment types listed by Maersk, including dry, high-cube, reefer, flat-rack, open-top and tank equipment. For a simple budget check, three 20-foot containers produce a PSS line of USD 3,000; two 40-foot containers produce USD 4,000; and one 20-foot plus one 40-foot container produces USD 3,000. These are arithmetic illustrations of this surcharge only, not freight quotations.
For non-SPOT bookings, Maersk says the rate is retrieved using the Price Calculation Date, or PCD. For non-FMC cargo, that is the scheduled departure date of the first water leg recorded when a non-spot booking is confirmed. For FMC cargo, it is the last container gate-in date. The carrier also says other local and contingency charges may apply.
The practical lesson is that a cargo-ready date or booking-request date alone does not prove which PSS level belongs in a file. The confirmed quote, booking record, applicable PCD and equipment must be read together.
Six checks before confirming the booking
1. Test the exact corridor
Confirm that the origin is Vietnam and that the contractual destination falls within the five destinations named in the notice. Do not automatically extend the notice to Oman, Iraq, Jeddah or every Saudi location. Dammam is the only Saudi destination stated in this PSS announcement.
2. Lock the equipment count
Record the number of 20-foot, 40-foot and 45-foot units separately. Do not multiply a TEU estimate by the per-container figure: the notice sets USD 1,000 for all 20-foot equipment and USD 2,000 for all 40- and 45-foot equipment. Confirm any split booking or equipment substitution before approving the cost.
3. Save the pricing trigger
For a non-SPOT file, retain the booking confirmation and the PCD basis shown by the carrier. If the shipment is near the effective-date boundary, ask Maersk to confirm the applicable surcharge in writing. Do not infer the trigger from the invoice date, cargo-ready date or vessel arrival date.
4. Keep the PSS separate from the landed-cost total
Give the PSS its own line in the comparison sheet. The carrier notice explicitly says other applicable surcharges, local charges and contingency charges can remain. Ocean freight, origin handling, destination handling, inland transport, customs, insurance, storage, demurrage and detention are separate questions.
5. Recheck cargo acceptance and routing
Maersk's Middle East Operational Update 55, dated 18 November, says conditions remain highly volatile. Acceptance differs by dry, reefer, dangerous and out-of-gauge cargo, while certain routings and landside solutions are restricted or subject to capacity. The same update describes congestion at Khor Fakkan and possible changes to collection, transit and final-delivery arrangements.
Treat a price confirmation as distinct from operational acceptance. Before container release or stuffing, verify the exact commodity, equipment, port pair, transshipment plan, final place of delivery and latest acceptance status.
6. Align sales, finance and consignee
Put the carrier notice, confirmed surcharge, quote validity, payer, currency rule and approval owner in one shipment record. Tell the Gulf consignee whether the PSS is prepaid, collect or embedded in another quoted line. If the customer quote predates the notice, decide who absorbs or passes through the change before loading.
Why the security context still matters
The PSS notice itself does not state that it is a universal security charge. It should therefore be described by its published name: Peak Season Surcharge.
Separately, current official updates show why Gulf bookings require live operational checks. On 18 November, Maersk continued to describe the regional environment as volatile and its booking, routing and landside arrangements as changeable. On 6 November, the International Maritime Organization reported that the death of a seafarer after a 5 November attack brought confirmed casualties since the start of the Strait of Hormuz conflict to 25, and that IMO had verified at least 130 attacks against commercial vessels in the region.
Those facts support caution, but they do not prove the reason for every rate line or predict the outcome of a particular Vietnam shipment.
Concrete impact for Vietnam exporters and freight teams
The immediate impact is a carrier-specific budget and approval check on affected Vietnam-origin containers from 19 November. A missed USD 1,000 or USD 2,000 line can invalidate a margin, purchase order or delivered-cost comparison even when the base ocean rate is unchanged.
Add these fields to the booking sheet: `carrier notice version`, `origin`, `contractual destination`, `equipment count`, `booking type`, `PCD basis`, `PSS amount`, `other surcharge lines`, `cargo acceptance checked at`, `routing checked at`, `payer`, and `customer approval`.
Confidence is high on the published Maersk scope, figures, effective date, equipment coverage and non-SPOT PCD rules. Confidence is medium at shipment level because live quotations, contracts, regulatory treatment, cargo type, routing, acceptance and other charges can change. Verify the current carrier quote and operational status before acting. This is operational editorial guidance, not a binding quotation or legal advice.
Turn this guidance into a shipment check
Use the relevant commercial route or Vietnam handling service below, then send the real shipment details for a current option. Rates, space and transit plans are checked against the live requirement.
Official and editorial sources
Need an updated freight quote?
Send John your cargo details and preferred route. He will help check the best practical option.
Get a Freight Quote